AL-ALAMIYYEH SEWER PROJECT 2013

The project objectives are to improve the environmental quality of ALALAMIYYEH area in Aqaba by upgrading the existing sewer network and to solve inhabitants troubles throughout a lot of blockage and waste water leak. The project includes but not limited to supply and install of approximately 25,000 meter of UPVC pipe with different diameters and the necessary manholes by redirecting the flow to new sewer network too.

 

Geographic Location & climate :
Al-Alameyyeh is located on approximately 615,000 square meters of land adjacent to the Downtown of Aqaba on a characteristic urban area & flatland (elevation about 25m above sea level). Aqaba has dry Mediterranean climate of baking hot summers, very warm winters and very low rainfall & highly fertile with average annual rainfall 10mm, southern dry wind from Arabia ,average high temperature 37° & low 21° . the geographic location of project is (29°32'32.86"N, 35° 0'37.70"E

 

Scope of work :
1- UPVC PIPE COLLECTION NETWORK
Supply & install UPVC pipe Diameter 200-300mm for the main line & 150mm for house connection line . Quantity for 300 Dia. UPVC pipe = 90 liner meter Quantity for 200 Dia. UPVC pipe = 6,900 liner meter Quantity for 150 Dia. UPVC pipe = 12,000 liner meter

employer
Aqaba Water Company
consultant
Dar Al-Omran Infrastructure & Environment
sector
Water Projects
Location
jordan /Aqaba
completion date
19/02/2013