Wastewater Treatment Plant and Effluent Facilities (C-1) Extra Works (Optional Items)

The works include the following: Trunk line from WWTP Wadi Arab to the connection point of contract 3 with total length about 14 Km , DIP of 800 mm dia

- Filtration comprising multi-layer filter medium and all backwash facilities.

- UV-Disinfection installed in open channels after the filtration.

employer
Water Authority of Jordan
consultant
Fichtner /BBV/PFI/CC
sector
Water Projects
Location
jordan /Irbid
completion date
09/07/2014