The works include the following: Trunk line from WWTP Wadi Arab to the connection point of contract 3 with total length about 14 Km , DIP of 800 mm dia
- Filtration comprising multi-layer filter medium and all backwash facilities.
- UV-Disinfection installed in open channels after the filtration.