AL-ALAMIYYEH SEWER PROJECT 2010

The project scope of work is supply, delivery, installation, testing, disinfection, operation, commissioning, and maintenance of Hmaymeh water supply system which consists of:

1.Main line of 12Km of 300mm, 7.9Km of 200mm and 6.7Km of 150mm including valves, all fittings and the connection to the existing water pipeline, this line will feed Humaymeh.

2.Main pump station (consist of two Pumps with capacity 180m3 @ 250m Head and two with capacity 100m3 @ 180m Head) and booster Pump station including pumps (two Pumps with capacity 100m3 @ 250m Head) landscaping, electrical and electro-mechanical works.

3.Four Reservoirs with Capacity of 750m3 at main Pump Station, 500m3 at the Booster Pump Station, 300 m3 at Humaymeh and 300 m3 at Rashdiya.

4.A line of 4.75Km of 150mm to feed Rashdiya.

5. Pumping Station.

6. CL2 System.

7. SCADA System.
 

employer
Aqaba Water Company
consultant
Aqaba Water Company
sector
Water Projects
Location
jordan /Aqaba
completion date
19/02/2010