Package (1) Design, Construction and Commissioning of Um Elulu- Jerash and Hofa-Ajloun System Facilities

Package 1 - Design, Construction and Commissioning of Um Elulu-Jerash and Hofa- Ajloun System
Facilities The work includes the design and construction of new facilities and upgrading of existing facilities in Jerash and Ajloun Water Transmission systems as follows:

 

1. New Pump House and reservoir at Um Elulu including the rehabilitation of existing Um Elulu Pump Station.
2. New Pump House and reservoir at Buwayda Pump Station
3. New pump house at Hofa Pump Station
4. New pump house at Samad Pump Stations with new reservoir Including rehabilitation of existing structures.
5. New Ishtafina Reservoir with a capacity of 4000 m3 and rehabilitation of existing structures.
6. Flow control, Surge protection, Electrical , site works and other miscellaneous items.

employer
Water Authority of Jordan
consultant
Engicon
sector
Water Projects
Location
jordan /Jerash
completion date
03/08/2014