ENERGY EFFICIENCY IMPROVEMENT IN THE JORDANIAN WATER SECTOR (PHASE 1,2,3) COMPONENT 1,2,3: REHABILITATION OF PUMP STATIONS

Wadi Arab PS0
The refurbishment of the WA 0 PS will include:
(1) new electromechanical equipment and related station piping.
(2) a new surge protection tank and appurtenant equipment for the suction pipe.
(3) new electrical panels, MCCs and power cables.
(4) new I&C equipment incl. station PLC.
(5) related civil work upgrade and refurbishment measures.
(6) auxiliary measures at the existing reservoir.

Wadi Arab PS1
The refurbishment of the WA PS 1 will include
(1) new electromechanical equipment and related station piping.
(2) a new surge protection tank and appurtenant equipment.
(3) new electrical panels, MCCs and power cables.
(4) new I&C equipment incl. station PLC.
(5) related civil work upgrade and refurbishment measures.
(6) auxiliary measures at the existing reservoir.

Juhfiya PS
The refurbishment of the Juhfiya PS will include
(1) new electromechanical equipment and related station piping.
(2) two new surge protection tank and appurtenant equipment.
(3) new electrical panels, MCCs and power cables.
(4) new I&C equipment incl. station PLC.
(5) related civil work upgrade and refurbishment measures.
(6) auxiliary measures at the existing reservoir.

Al Muntazah PS
The upgrade of the new Muntazah PS shall include
(1) new electromechanical equipment and related station piping.
(2) new electrical panels, MCCs and power cables.
(3) upgrade of existing and new I&C equipment.
(4) related civil work upgrade and refurbishment measures.
(5) auxiliary measures at the existing underground pipe work incl. the construction of a new
valve chamber.

Qatraneh PS
The refurbishment of the Qatraneh PS will include
(1) new electromechanical equipment and related station piping.
(2) two new surge protection tanks and appurtenant equipment.
(3) new electrical panels, MCCs and power cables.
(4) new I&C equipment incl. station PLC.
(5) related civil work upgrade and refurbishment measures.
(5) auxiliary measures at the existing reservoir.

Damkhi PS
The refurbishment of the Damkhi PS will include
(1) new electromechanical equipment and related station piping.
(2) a new surge protection tank and appurtenant equipment.
(3) new electrical panels, MCCs and power cables.
(4) new I&C equipment incl. station PLC.
(5) related civil work upgrade and refurbishment measures.
(5) auxiliary measures at the existing reservoir.

Wadi Eseer PS
The refurbishment of the Wadi Eseer PS will include
(1) new electromechanical equipment and related station piping.
(2) two new surge protection tanks and appurtenant equipment.
(3) new electrical panels, MCCs and power cables.
(4) new I&C equipment incl. station PLC.
(5) related civil work particularly a new elevated treated water tank, pump foundations and
general upgrade and refurbishment measures.
(6) auxiliary measures at the existing membrane filtration units e.g. a reconnection of the
discharge pipes from the membrane filtration units to the new treated water tank.


Ain Ghazal PS
The refurbishment of the Ain Ghazal PS will include
(1) new electromechanical equipment and related station piping.
(2) new electrical panels, MCCs and power cables.
(3) new I&C equipment incl. station PLC.
(4) related civil work upgrade and refurbishment measures.


Zibdah PS
The refurbishment of the Zibdah PS will include
(1) new electromechanical equipment and related station piping.
(2) a new surge protection tank and appurtenant equipment.
(3) new chlorination equipment.
(4) new electrical panels, MCCs and power cables.
(5) new I&C equipment incl. station PLC.
(6) new operation building and related civil work upgrade and refurbishment measures.
(7) auxiliary measures at the existing reservoir.


At Tamween PS
The refurbishment of the At Tamween PS will include
(1) new electromechanical equipment and related station piping.
(2) a new surge protection tank and appurtenant equipment.
(3) new electrical panels, MCCs and power cables.
(4) new I&C equipment incl. station PLC.
(5) related civil work upgrade and refurbishment measures.
(6) auxiliary measures at the existing reservoir.

employer
Ministry of Water and Irrigation – Water Authority
consultant
Fichtner Water and Transportation GMBH
sector
Water Projects
Location
jordan
completion date
02/01/2019