Bridge 4 Rehabilitation Works – Sweimwh – Zara Road /Dead Sea

The tender includes rehabilitation work for the bridge based on Wadi Zarqa Ma'in on Al-Suwaima - Al-Zara / Dead Sea road, and the bridge is (75) metres long and (11.9) metres wide. The work includes repairing the damaged reinforced concrete elements, injecting cracks wherever they exist, replacing rubber acclt pads where necessary, carrying out reinforced concrete barriers on both sides of the bridge with a length of (85) metres from each side, removing the existing asphalt layer above the bridge surface, removing existing expansion joints, doing everything necessary to install new expansion joints, implementing moisture and water-infection and surface asphalt layer work and As shown

employer
Ministry of Public Works & Housing
consultant
Associated Consulting Engineering Intl
sector
Roads, Tunnels, & Bridges
Location
jordan /Ghor
completion date
12/12/2020