Design, Construction & Commissioning of Supervisory Control and Data Acquisition (SCADA) System – FARA 9

The scope of work includes the design and construction and commission of the Design, construction and commission of comprehensive Supe1visory Control and Data Acquisition (SCADA) system, for both Amman and Madaba Governorate in order to efficiently monitor and control the functionality of all water resources and their distribution.

The work shall include but not limited to the following tasks:
1. Replace deteriorated Programmable Logic Controllers (PLCs) / Remote Telemet1y Units (RTUs).
2. Replace deteriorated instrument devices such as level meters, flow switch . .. .. etc.
3. Replace deteriorated flow meters in selected sites.
4. Install new electrical panels, soft starter and VFD in selected sites.
5. Install new flow control valves and valve actuators in selected sites.
6. Connect the existing PLC with proposed PLC/RTU, and with the related Local SCAD.A.
7. Install pressure transmitters and Pressure switches on main suction and discharge pipes.
8. Install new turbidity meters.
9. Install operator interface (HMI) at field sites.
10. Connecting I / 0 signals at field site with proposed PLCs/ RTUs.
11. Install Pump Motor protection and connecting the signal to proposed PLCs/RTUs
12. Installing proposed local SCADA System and remote monitor software.
13. All TIER II SCADA applications shall be the same make, model, and version as the TIER . The TIER II SCADA applications shall be completely integrated, with the same features and functions, into the TIER I.
14. Connecting the existing RTU installed by other contractors to main SCADA.
15. It is the responsibility of FARA 9 Contractor to interface the data (Input and Output) from the sub SCAD A ofF ARA 8 and FARA 11 to the main SCAD A.
16. Installatio PLC in Mwaqer Pumping station to collect data from existing PLC in Mwaqer then send the data to SCAD A Amman through ADSL communication
17. Install firewall protection system for Data center and SCAD A system.
18. Setpoints, control pushbuttons, and selector switches shall be reserved to popups and faceplates to avoid accidental operations.
19. supply install and commission all necessary communications equipment and software to provide a complete integrated communications network for the SCADA  system Install dashboard and asset management software with integration to main SCADA system.

 

employer
JWC – Miyahuna
consultant
JWC – Miyahuna
sector
Electromechanical Projects
Location
jordan /Madaba
completion date
02/08/2020