The project comprises the construction of Infrastructure and Landscaping of general location of German Jordan University, the project consist the following:
1- Construction of two Car Park Buildings with total area 9,755 m2
2- Constructed of aprons with area 30000m2 consist the cutting, filling, Granular sub-base coarse layer, Crushed aggregate base coarse layer and Binder & Wearing coarse layer.
3- Constructed of first stage rods with longs 8km consist cutting work, filling work, Granular subbase coarse layer work, Crushed aggregate base coarse layer work and Binder & Wearing coarse layer work.
4- Construction of Wastewater Treatments Plant with total area 700 m2
5- Construction of Wastewater UPVC network Collection lines sizes ranging from 160mm diameter up to 613mm with total Length 5,550 m .
6- Construction of Water Distribution Network.
7- Construction of Fire Protection System network including fire protection pump station.
8- Construction of LP Gas system network including underground 24000 L Tank.
9- Construction of Irrigation Network.
10- Construction of Electrical Power Network including Standby Generators.
11- Construction of Communication Network.
12- Construction of JEBCO transformers 6 Buildings with total area 940 m2