Libb Pumping Station

This project consist of the supply, construction, installation, testing, commissioning and maintenance of the following equipment and works:

1. Pump Room containing 5 Centrifugal Surface Pumping Units each of 600 m3/hr capacity at 290m head. Each pump was coupled to 110 KW low voltage motor.

2. Control Room containing Pump’s Starters and Mimic & Instrumentation Panel for Controlling and monitoring of all pumping units and related equipment.

3. Diesel Generator Room containing 2 Stand-by 1500 KVA Diesel Generator units complete with synchronizing and load sharing.

4. Chlorine Room containing a complete Chlorinating System for water disinfecting using Cl2 gas

5. Power Sup-Station comprising 5 outdoor 33 KV/ 400 V power transformer of 200 KVA rating including H.V and L.V and L.V cabling.

6. 6000 m3 Reinforced Concrete Water Reservoir with all accessories.

7. Staff Residence, Guard Residence and asphalted yards.

employer
Libb Pumping Station
consultant
Water Authority of Jordan.
sector
Water Projects
Location
jordan /amman
completion date
31/01/1993