This project comprise of the construction of water intake structure, distilling basins and operation building. It also includes the installation of motorized trash racks, motorized valves, motorized - self cleaning fine screens, flow meters, turbidity meters and control panels so the total system has been fully atomized and tele-controlled through a comprehensive telemetry system. The scope of work also include external works as gabion protection works, netting works for side slopes, access roads, asphalt yards, fences and gates.